top of page

York Energy Centre 400 MW Simple Cycle Power Project

CLIENT: YORK ENERGY CENTRE L.P.

LOCATION: KING TOWNSHIP, ONTARIO

CONTRACTUAL IN‐SERVICE DATE: MAY 30, 2012

ACTUAL IN‐SERVICE DATE: MARCH 16, 2012

SCOPE: EPC CONTRACTOR

Full EPC Services for the 400 MW York Energy Centre which consists of two (2) Siemens STG6 – 5000 – F4 Gas Fired Turbines operating in Simple Cycle Mode as a Peaking Facility and load support, in the North York Region of Ontario. Phoenix was also responsible for the design and construction of the 230kV Switchyard to allow the facility to interconnect with the Hydro One Transmission System.

 

Phoenix assisted the Owner in the negotiation of the Siemens Turbine Generators Supply Agreement and provided all of the Balance of Plant Equipment for the Project. We also assisted the Owner in completing the Environmental Assessment and obtaining the Air, Noise and Industrial Sewage Permits from the Ontario Ministry of the Environment. A Full Notice to Proceed for the project was issued in September of 2010.

Please reload

Corporate Headquarters                   Phoenix Tulsa Office                               Phoenix North Constructors

650 From Road | Suite 255                     18 S. Lewis Avenue                                     715 5th Avenue SW | Suite 2920 

Paramus, NJ 07652                                Tulsa, OK 74104                                          Calgary, AB T2P 2X6                                                                                                                 

© Content copyright 2017 Phoenix Power Group, Inc. All rights reserved.

  • LinkedIn - Black Circle
  • Facebook - Black Circle
bottom of page